Get Latest Final Year Projects in your Email

Your Email ID:
PA Subs

PSQS – Power Supply Quality Simulator (EEE/ECE Project)

Download Project:

Fields with * are mandatory

Kitron had wishes to be able to test and measure how disturbance affects their vehicle electronic units before they have been verified by SP Technical Research Institute of Sweden in Borås.

This work started with the writing of a demand specification together with Kitron for a product PSQS, Power Supply Quality Simulator, which can generate some test pulses according to a standard for electronic units to Volvos vehicles.

A design proposal was developed with the help the demand specification and was verified with the help of simulations. All electric schematics was designed with the guide of the design proposal. The pulses realized in the works of this thesis are those which Kitron experienced that they have a need to test in their own premises and which are possible to generate with the means available. All work took place at Kitron in Jönköping, the restriction of the work has been the cost of components not to be to high as well as the finished product shall be easily managed.

This study work resulted in a unit which is possible to produce a number of disturbances on the voltage feed to a unit under test. Some pulses have not been completely correct according to Volvos standard. There are large possibilities to further develop PSQS to a unit that follows Volvos standard and even other vehicle producer’s standards.
Source: Jönköping University
Author: Ahlström, Johan | Nordström, Edward

Download Project

Download Project:

Fields with * are mandatory