Get Latest Final Year Projects in your Email

Your Email ID:
PA Subs

The Development of Multi-Axis Real-time Substructure Testing (Civil Project)

ABSTRACT

Real-time substructure is a novel hybrid method for the dynamic testing of structures. During an experiment, the structure of interest is divided into two entities. The crucial parts for the project undertaken are physically replicated and loaded Continue reading

Computationally Efficient Model for On-Board Simulation of Heavy Duty Diesel Engines (Mechanical/Electrical Project)

Simulating the translatory motion of a vehicle during a gear shift gives a good basis to evaluate performance and comfort of a Continue reading

Large Scale Monolithic Solar Panel Simulation – A Study on Partial Shading Degradation (Electrical Project)

Shadow-induced degradation is a major concern for both power output and long-term reliability in solar cells. Apart from the obvious fact that shading reduces the amount of solar irradiance available to solar panels, it may lead to formation of Continue reading

Load Management for a Telecom Charging System (Computer/Electronics Project)

There are a huge number of customers using Ericsson’s prepaid telecom charging system. This means that even the smallest optimization done in its management of load results in a big win when Continue reading