ABSTRACT:
GRS abutment systems were studied from October 2010 through December 2011 as a potentially cost-effective and structurally-efficient alternative Continue reading
Get Latest Final Year Projects in your Email
ABSTRACT:
GRS abutment systems were studied from October 2010 through December 2011 as a potentially cost-effective and structurally-efficient alternative Continue reading
This is a study about how to improve the building envelope from a group of housing belonging to The Million Programme, a housing programme implanted in the Sweden around 70’s. Massive buildings made of concrete, which were constructed really Continue reading
This project means to be a good guide for engineers, when performing a Life Cycle Assessment of a railway bridge, and to become a useful tool to compare several alternatives to identify the best option relating the environmental Continue reading
Due to efficient dissemination of congested traffic, economic considerations, and aesthetic desirability horizontally curved steel box girder bridges have become Continue reading