Get Latest Final Year Projects in your Email

Your Email ID:
PA Subs

Virtual RC Damping of LCL-Filtered Voltage Source Converters With Extended Selective Harmonic Compensation (Electrical Project)

ABSTRACT

Active damping and harmonic compensation are two common challenges faced by LCL-filtered voltage source converters. To manage them holistically, this paper begins by proposing a virtual RC damper in Continue reading

Aspects Of The Choice Of Sampling Frequency In The Control System Of A Gas Turbine (Electrical/Electronics Project)

ABSTRACT

At Siemens, PLCs are used to control the gas turbines, and to execute the code in the plcs cyclic interrupts are used. If the execution time for the interrupt becomes close to the cyclic time of the interrupt the load of the PLC increases. High load levels Continue reading