The immense urbanization of the twentieth century resulted in population and territory growth through the attachment of several nearby villages to the Continue reading
Get Latest Final Year Projects in your Email
Tag: Construction
Behavior and Analysis of an Instrumented Slab Bridge (Civil Project)
Because of quick construction and cost effectiveness, adjacent precast, prestressed box girder bridges have been used nowadays more often for Continue reading
A Study of Optimizing the Processing Time for Building Permits (Civil Project)
There are rules in urban development and the construction industry, which encourages organizations to work according to standards and approved codes. For example: it is required by law for all property owners to Continue reading
The Impact of BIM/VDC on ROI: Developing a Financial Model for Savings and ROI Calculation of Construction Projects (Civil Project)
Building Information Modeling (BIM) or Virtual Design and Construction (VDC) recently has been regarded as crucial by the architecture, engineering, and construction (AEC) industry. The use of Continue reading
Towards a Robust Society (Civil Project)
This is a project where a method for assessing the robustness of a neighbourhood/residential area has been introduced and applied in Buffalo City Municipality in South Africa. The purpose of the project was to Continue reading
Influence of In-filled Trench as Wave Barrier on Ground Vibrations (Civil Project)
With the development and expansion of traffic systems, problems associated with ground vibrations have required increased attention. Increasing vehicle loads,traffic volumes, and aging roads and railways,vibrations induced by traffic are gradually becoming a Continue reading
Weldless Flange Connections (Mechanical Project)
This development project is a bachelor’s degree thesis work that will conclude the education program ”Development Technology” at Blekinge Institute of Technology. The development project has been done in cooperation with Faurecia Exhaust Systems AB in Torsås that constructs and Continue reading
Quantitative Analysis of the Impact of Craft Labor Availability on Construction Project Performance (Civil Project)
ABSTRACT
A shortage of skilled craft labor in the North American construction industry has been an unfortunate cyclic trend since the late 1980s. This shortage has been reported and discussed frequently by numerous past studies in the context of Continue reading
Public Private Partnerships: as a Public Infrastructure Optimizer (Civil Project)
A public private partnership is an alternative to procurement of the facility by the public sector, using funding from Continue reading
A Comparison of Qualifications based-Selection and Best Value Procurement for Construction Manager/General Contractor Highway Construction (Civil Project)
ABSTRACT
Faster project delivery and the infusion of contractor knowledge into design are the primary drivers for choosing construction manager/general contractor (CM/GC) project delivery. This paper focuses on the use of qualifications-based (QBS) and Continue reading
Peel Resistance of Adhesive Joints with Elastomer–Carbon Black Composite as Surface Sensing Membranes (Civil Project)
ABSTRACT
The peel resistance of four adhesives (“J-B Weld” by J-B Weld (adhesive A), 3 M Scotch-Weld DP 125 Gy (adhesive B), Loctite PL Premium (3x) Construction Adhesive (adhesive C), and Henkel Hysol EA9394 (adhesive D)) is investigated for Continue reading
Virtual Operator Modeling Approach for Construction Machinery (Civil Project)
ABSTRACT
Greater understanding of how highly skilled operators achieve high machine performance and productivity can inform the development of automation technology for construction machinery. Current human operator models, however, have Continue reading